We can sit tall in the saddle knowing that we take pride in a job well done.
It’s a Montana thing.
TABLE OF CONTENTS:
Introduction – page 2
Specific Past Performance – page 3-
a) Eureka Hills and USDA Forest Service
b) Ray & Angela Cohen
c) Outlaw Flats
d) Sleeping Bear Homesteads
e) Dept. of National Resources
f) Ravens Ridge
g) Whitefish Credit Union
h) Rebacca Farms
i) Southwest Greens of The North Country
j) Eureka Hill, 2nd. Phase
k) Medlar Project
l) Lincoln Electric
m) Johnson Project
n) Yanak Ranch
o) Turner Subdivision
Comments – page 8
Reference Sheet – page 8-
Owned Equipment List – page 10-
Employees & Qualifications – page 11-
Introduction
Riding High Excavation Inc: principally established in northwest Montana since 1989, has a Montana State Contractor Registry #47346.
ORCA, CCR, HUB-
Digital Estimating: We utilize Quest Estimating & Take-
Operators & Equipment: Our operators have at least 20 years experience operating heavy equipment, receive annual wildfire training, receive Kootenai River Network Stream Course Training, and Erosion Control Training. Our operators and drivers are mechanically inclined. We maintain our own equipment and have the ability to lease anything else we need through any heavy equipment company.
Kootenai River Network: Our employees have been trained in stream course reconstruction with Rox Rogers & John Muhlfeld, hydrologist with River Design, as instructors.
Fortine Gravel: We maintain our own 40-
Rock Quarry: We maintain a large rock quarry for rip-
Masonry: Our employees have received certificates of training for the installations of Allan Block Products. This is a retaining wall system.
Synthetic Grasses: We have been certified as synthetic turf suppliers & installers. Company name Southwest Greens of the North Country.
Eureka Town Council: (Eureka Road Committee). I currently led a committee for the Town of Eureka to assist them with road and snow removal issues. I also do the formatting of contracts and bid layouts; this keeps engineering costs down for Eureka.
Specific Past Performance:
Eureka Hills: This is a 160-
a) Fire safety timber stand reduction to space trees 40-
b) Created burn piles with limbs over stumps, burnt them, and placed topsoil.
c) Consulted with developer to design and build a 24-
d) Built approx. 12,000 lineal feet of county spec. road base and 4 cul-
e) Installed 40 steel culverts in road system and armored basins & outfalls.
f) Installed 8400 square yards of road fabric.
g) Installed 46 monitor wells, recording soil strata on each with consultant.
h) Built 46 driveway approaches off of road system.
i) Installed 46 culverts in driveway approaches and armored basins & outfalls.
j) Built numerous home site platforms and turn arounds.
k) Installed 3” under-
l) Crushed and top-
m) The roadwork along the USDA Forest Service easement was supervised by the Murphy Lake Ranger District.
n) Watered the road system on a regular basis.
o) Built a 100,000 gallon pond structure for fire suppression water with suction access apparatus.
p) Sprayed for weeds.
q) Broadcast seed mix over the entire development.
Cohen: This is a single residence access road and development to a high elevation
building site on a steep and narrow property. Our contract was directly to the Owners,
Ray & Angela Cohen, and was priced for budget and carried out on a T&M (time & material)
basis with daily worksheet back-
a) Designed & built the road 22 feet wide, and the drainage plan, to climb over 300 feet in elevation within a 1320 foot property width, to county standards. R/W easements were established by Riding High. Including all cuts and center lines.
b) Installed culverts in road system and armored basins & outfalls.
c) Reduced timber and parked-
d) Created burn piles in right-
e) Installed road sleeves for telephone & electric utilities.
f) Built the home-
Outlaw Flats: This is a 240-
a) Consulted with developer to design, layout, and stake a road system.
b) Conducted exploratory digs for onsite gravel sourcing and samples for testing of moisture content, California Bearing Tests, and Proctors.
c) Installed 65 monitor wells, recording soil strata on each with engineer.
d) Cleaned up the creek flood-
Sleeping Bear Homesteads: This is a 200-
a) Coordinated and supervised a contract logger to create fire safety timber stand
reduction to space trees 40-
b) Removed stumps from same terrain and created burn piles with limbs over stumps,
burnt them, turned-
c) Consulted with developer to design and build a 24-
d) Built approx. 18,000 lineal feet of county spec. road base and 4 cul-
e) Installed 50 steel culverts in road system and armored basins & outfalls.
f) Installed 54 monitor wells, recording soil strata on each with engineer.
g) Built 54 driveway approaches off of road system.
h) Installed 54 culverts in driveway approaches and armored basins & outfalls.
i) Built several home site platforms and turn-
j) Watered the road system on a regular basis for dust control and compaction.
k) Broadcast seed mix on disturbed areas.
DNRC Fire Fighting and Protection: We were hired for fire fighting and protection
at the Brush Creek Fire and we were based out of Wolf Creek Road and the Fairview
Ranger Station during summer 2007. This was an Emergency Equipment Rental Agreement
(EERA) through the US Forest Service. All of our operators are initial attack operators
in wild-
Ravens Ridge: This project is a 15-
a) Parked-
b) Cleared and grubbed the road right-
c) Built property approach off of the State Hwy.
d) Constructed a 2000 lineal foot 20-
e) Installed 4 culverts in the road system, armored the basins & outfalls.
f) Built 5 driveway approaches off of road system.
g) Installed 5 culverts in driveway approaches, armored the basins & outfalls.
h) Constructed a water/sediment retention system.
i) Built 5 home site platforms and turn arounds.
j) Installed under-
k) Broadcast seed mix over the entire development.
Whitefish Credit Union: This is a new building in historic downtown Eureka, MT. Our contract was directly with the builder, Mostly Montana LLC, and was overseen by TD&H Consulting Engineers, in the amount of $130,000.00 during fiscal year 2008 for site work. The description of work performed is as follows:
a) Demolition & removal of existing building.
b) Site preparation to base grade.
c) Excavation & backfill of foundation.
d) Storm drainage
e) Floor slab grade preparations for concrete.
f) Excavations, sleeves, bedding, & backfills for power, telephone, water, & sewer utilities.
g) Parking lot and sidewalk grade preparations for asphalt and concrete.
h) Safety and traffic signage and barriers.
Rebecca Farms Facility: Project consisted of road systems to accommodate ground staff the ability to manicure the entire complex up to road edge. Riding High constructed the hunt jump arena, grass hill seating for observers and assisted the construction of cross country Olympic horse jumps. This facility was constructed for world horse events. Riding High constructed the entire road system with out the help of engineers. Included was the construction of rock features and a large pond. This project was unique in stature, (a must see).
Putting Greens of the North Country: We constructed a 5000 square foot golf green,
sand trap hazard, retaining wall, and 7500 square foot chipping fairway for the new
PGA-
Eureka Hills Subdivision: The finish top surface was laid on Phase II of the Eureka Hills Project. Work included the placement of ¾ crushed road gravel on a 24’ width. Grading and compaction work.
Terry and Kathy Medlar Residence : Road Reconstruction and Drainage Issue Project. This was a project where Riding High was hired to reconstruct and design a project that was recently done by another contractor. The project consisted of obliteration of a road that was causing drainage issues to the building platform of their residence. Riding High also constructed a new access to the residence. The work involved in this project was: Clearing and Grubbing of the R/W, Cut and Fill, Slopes constructed to a 2:1 slope, the installation of culvert pipe and construction of a parking lot. This project also required the final graveling and compaction to create positive drainage of the parking area of the building platform. All of the slopes were finishing with mulch and seed.
Lincoln Electric Co-
Steve Johnson Road Construction Project : Construct and surface road system to residence. Project consisted of, Drainage, Cut and Fill, Slope Construction and Final Gravel and Compaction. ”
Yanak Ranch Site: Road Construction and site development. Project consisted road systems, Parking lots, utilities, landscaping and drainage.
Turner Subdivision Road: Construction of ½ mile of road, home-
Comments on Government Contracts :
Riding High has completed many tasks. Working in Idaho for the U. S. F. S under the supervision of Kevin Naffin located in the Sandpoint N.F. District. On this project we also contracted and designed a fence 8’ high to encompass the Grouse Creek Seed Orchard Site. Our job for the Forest Service at that time was to create a seed orchard site for a white pine experimental station. We have obliterated many miles of Forest Service road in Noxon area for the Three Rivers District. We have installed many CMP’s for Eureka Forest Service under the supervision of Jenifer Brady and Ray Wells. Riding High has completed excavator and dozer piling projects for the D.N.R.C for Rick Komenda at the Stillwater Station. We are diverse in most any field in the horizontal construction area.
References
USDA Forest Service
Murphy Lake & Eureka Ranger Districts
Jennifer Brady – Engineer
Re: Eureka Hills access easement road
(406) 296-
DNRC – Libby District
John Schotzberger
Re: fire fighting, prevention, & controls
(406) 293-
TD&H Consulting Engineers
Dan Lozar – engineer
31 Three Mile Drive, Suite 101
Kalispell, Montana 59901
Re: Whitefish Credit Union
(406) 751-
Bart Culbertson – developer
P.O. Box 370
Eureka, MT 59917
Re: Eureka Hills, Outlaw Flats, & Sleeping Bear Homesteads
(406) 250-
Milo Corporation
Mike Workman – developer
P.O. Box 1791
Eureka, MT 59917
Re: Ravens Ridge
(406) 297-
Ray & Angela Cohen -
1852 Sharon Lane
Santa Ana, CA 92705
Re: high mountain home road & access
(949) 702-
Daryl Harr
10437 Garden Hwy.
Sacramento, CA 95837
Re: large residential road & building site
(209) 401-
Marc Pitman, Manager
Kalispell Unit Office
DNRC Water Resources
Phone (406) 752-
mpitman@mt.gov
Apec Engineering
Bob Stouffer
100 Financial Drive Ste 120
Kalispell, MT. 59901
(406) 755-
USFS
Cabinet District
2693 Hwy. 200
Trout Creek, Mt. 59874
Chuck Williams / (406) 847-
Art Montoya / (406) 827-
Road Obliteration and Deep Culvert Removal
Stream Course Reclamation
Terry and Kathy Medlar
63 Bobsled Run Rexford, Mt. 59930 (406) 471-
Real Estate Clients: Mike Workman: Century 21, Eureka. Wink Jordan: Century 21, Whitefish Vic Workman: Whitefish Gary Mason: Eureka Paul Wachholz: Kalispell
Owned Equipment List:
Excavators:
a) 2007 John Deere 270D; hydraulic thumb with Forest Guard Pkg. -
b) 2005 Hitachi 120; hydraulic thumb with Forest Guard Pkg. -
Dozers:
a) 2007 John Deere 850J with 6-
b) 1995 Allis FD14E with angle blade, multi-
Front-
a) Komatsu 250-
Road Grader:
a) Volvo 736 V.H.P. Articulated 14” moldboard blade – 1400 hrs.
Skip-
a) Case 570 XLT, with 4in1 bucket & Gannon back-
Vibratory Roller:
a) Bomag 172D Smooth Drum
Dump Trucks:
a) 2003 KW 600 H.P. Cat. 16’ dump box w/ lift axle – 250K miles
b) 1995 KW lift axle, 16’ dump box -
Belly Dumps:
a) Lowboy & Bellydump Tractor 425hp – new rebuild.
b) 1995 Trailblazer Belly dump 22cy Trailer
Trailers:
a) 2002 Wallace detach 20’ well Lowboy – 50 Ton.
b) 2006 Trail King pintle-
c) 2008 Haulmark Jobsite Trailer – office & storage ends.
Shop Truck:
a) Dodge 1.5 Ton equipped with welder, cutting tools, compaction equip.
compressor, and many hand tools.
Water Truck:
a) 1987 KW 425hp 4000gal. w/quick-
Miscellaneous:
a) trash pumps, signs, broadcast seeders, farming discs, culti-
b) GPS tools, levels, digital estimator board & software.
Employees & Qualifications:
Tim Ryan, President: 25 years experience operating heavy equipment with Class A Montana
License, Wildfire training annually, Kootenai River Network Stream Course Training,
Erosion Control Training, Allan Block Product Installation Certification. Educated
in the field of Quest Estimating & Take-
P.O. Box 1016 Eureka, MT 59917; (406) 889-
ridinghigh@montanasky.net -
Eddie Rosas, Foreman: 20 years experience operating heavy equipment with Class A Montana License; Wildfire training annually, Kootenai River Network Stream Course Training, Erosion Control Training, Allan Block Product Installation Certification, Synthetic Grass Installer.
311 3rd Avee. Eureka, MT 59917 (406) 882-
Dave Mills, Foreman: 25 years experience operating heavy equipment with Class A Montana License; Wildfire training annually, Kootenai River Network Stream Course Training, Erosion Control Training, Allan Block Product Installation Certification, Synthetic Grass Installer.
P.O. Box 203 Eureka, MT 59917 (406) 291-
Dan Crain, Operator/Driver: 20-
103 Canada Drive Eureka, MT 59917 (406) 882-
Allen Seed, Operator: 20-
P.O. Box 748 Eureka, MT 59917 (406) 291-
Logan Workman: 10 years experience with excavators, dozers and layout. Wildfire training annually and experience with the Kootenai River Stream Course Training. Logan is very qualified in rock retainers and pond development.
Riding High will submit any additional information upon request.